Financing a multi-unit development site works best when you plan the loan around the build, not just the land purchase. If you get the structure right before you sign, you protect your cash flow, your tax position and your approval.
If you are in Ashfield and weighing up a site for a duplex, townhouses or a small block of units, this article covers the mistakes that tend to cost the most. Our construction loans page explains the product basics. Here we focus on the decisions specific to a multi-unit project.
Mistake 1: Treating a Multi-Unit Site Like a Standard Home Loan
A loan for land that will carry several dwellings is usually assessed as a construction or development exposure, not as an ordinary home loan. Banks regulated by APRA generally class a property that is not fully completed as land acquisition, development and construction (ADC) lending.
APRA's guidance says ADC loans are not limited to companies. They include loans to individuals developing investment properties. There is an exception for a loan secured by residential property under construction where it will be the borrower's primary residence. APRA's guidance also says it would be reasonable to treat an incomplete duplex as an owner-occupied loan where you plan to live in one dwelling and rent the other.
These are capital rules for banks, so they do not set your rate or terms. They do explain why lenders ask different questions about your project. Each lender sets its own policy on the number of drawdowns, fees, time limits and inspections, so the lender you choose matters. A broker can compare construction finance options from the lenders on their panel.
Mistake 2: Forgetting That Serviceability Still Applies
A lender must still check that you can afford the repayments, even though new dwelling construction is exempt from APRA's debt-to-income limit. That limit applies to a bank's overall lending portfolio. It is not a test of your individual application.
Banks regulated by APRA must assess your ability to repay at a rate at least 3 percentage points above the loan's actual rate. APRA confirmed in May 2026 that this buffer remains in place. If part of your income is overtime or bonuses, a prudent lender may discount it by at least 20 per cent.
Work out your borrowing capacity before you bid on a site, not after. Existing debts across your other properties count too.
How Interest Works During the Build
Many lenders charge interest only on the amount drawn during construction, not on the full approved loan amount, but this varies by lender. Confirm your lender's terms. Where interest is charged on the drawn balance, early repayments are lower than they would be on a fully drawn loan.
As an illustrative example at 6.75% p.a., a borrower has drawn $200,000 to settle the land. Interest-only repayments on that balance would be about $13,500 a year, or $1,125 a month. After several build stages, the drawn balance reaches $800,000. At the same illustrative rate, interest alone is $54,000 a year, or $4,500 a month.
The borrower budgeted for the first figure and was caught short as the balance grew. They fixed it by asking their broker to model the repayment at each stage before settlement. They set aside an interest buffer in line with the highest drawn balance, and they knew the repayment steps up well before the build is finished. NSW Government guidance says a borrower financing a project home must start repayments once the first progress payment is made and they begin drawing down. Check with your lender on how interest is handled during construction.
The trade-off is that interest-only repayment options are cheaper in the short term but do not reduce your debt. When the loan moves to principal and interest, repayments are assessed and calculated over a shorter remaining term, so they are higher.
Ready to get started?
Book a chat with a Finance & Mortgage Broker at Little Bull Finance today.
Mistake 3: Mismatching the Draw Schedule and the Building Contract
Your lender's construction draw schedule should line up with the progress payment schedule in your building contract. If they do not match, the builder may expect payment before the lender will release funds.
In NSW, the Home Building Act sets the maximum deposit at 10 per cent for residential building work. Work over $20,000 needs a contract with a progress payment schedule. Payments must match work actually carried out. Where Home Building Compensation Scheme cover is required, the contractor cannot ask for a deposit until cover is in place and a certificate is given. Whether these rules apply to your project depends on its size and structure, so confirm that with your solicitor.
Some lenders require an independent progress inspection before releasing each payment, and requirements vary by lender. Building Commission NSW gives $250 to $500 as an indicative cost of each independent inspection. With a multi-unit project, that adds up across stages and dwellings. Ask a registered builder how they will structure claims, and ask your lender how long it takes to release a payment.
Mistake 4: Mixing Land and Construction Debt Without Tax Advice
How you structure the loans can affect which interest costs are deductible, so get advice from your accountant before settlement.
The ATO says you cannot claim holding costs on vacant land, including interest on money borrowed to buy the land. Land counts as vacant while the new residential premises are not yet lawfully able to be occupied. Interest on borrowings for the construction itself is treated differently. In the ATO's example, a buyer has one loan for the land and a separate loan for building a house to rent out. Interest on the construction loan can be claimed, but interest on the land loan cannot while the land stays vacant. Where one loan funds both, the interest must be apportioned.
Consider a buyer who plans to build two townhouses to rent out. They put everything under one loan and then cannot easily separate the land interest from the construction interest. In a scenario like this, a better approach is to speak with an accountant first, then have the broker set up separate loan splits so the records are clear. The outcome is cleaner records and fewer disputes at tax time. Whether this suits your circumstances is a question for your accountant, as tax outcomes are never certain. If you plan to hold the dwellings as rentals, also read about our investment loans.
Mistake 5: Buying Before Checking Development Approval and Council Plans
Before you settle on the site, find out what approval it needs and what your lender will require. A development application and council approval affect the number of dwellings, the build cost and the final loan amount.
The Inner West Council is usually the first point of contact for Ashfield, but the assessment pathway depends on the size and type of your project. Confirm the pathway with a town planner or solicitor. Lenders set their own rules on whether approvals must be in place before releasing funds, so raise this at the start of your construction loan application. If you can, make your contract of sale conditional on approval, and ask your solicitor how to word that condition.
The main risk is time. Delays in approval mean holding costs and interest on the land while nothing is being built. Allow a buffer in your budget for that period.
Get the Structure Right Before You Sign
A short conversation before exchange can shape the loan, the contract and the budget together. Our Ashfield mortgage brokers can walk you through the lender options for your site and the draw stages that suit your build. Call one of our team or book an appointment at a time that works for you, and bring your plans, your builder's quote and a list of your current debts.
Frequently Asked Questions
Do I pay interest on the full construction loan from day one?
Usually not, but it depends on the lender. Many lenders charge interest only on the amount drawn, so repayments rise as each build stage is paid. Check with your lender on how interest is handled during construction.
Does the debt-to-income exemption mean my lender will not check affordability?
No. The exemption for new dwelling construction applies to a bank's overall portfolio limit. Lenders must still assess your ability to repay, including at a rate at least 3 percentage points above the loan rate for banks regulated by APRA.
Is interest on a construction loan tax deductible?
It can be in some cases. The ATO says interest on land borrowings is not deductible while the land is vacant, but interest on construction borrowings for a rental can be. Speak with your accountant, as outcomes depend on your circumstances.
Should my draw schedule match my building contract?
Yes. Your lender's draw schedule should line up with the contract's progress payment schedule so funds are released when the builder claims. Ask your broker and solicitor to compare them before you sign.